WorkConstruction · Electrical inspection
The inspection report builds itself while the electrician works.
Electricians inspect control panels on a tablet and the report builds itself as they go. The office checks it and releases one package per panel.
Built for a civil engineering and utilities contractorClickable prototypeSample data
Every name, figure and record here is inventedThe client's details are withheldThe workflow is the real one
What it does
No more retyping the paper report.
Who uses it
- Site electricians and apprentices
- Office reviewers
Photos land where they belongThe inspection works section by section, and every photo is attached to its slot the moment it's taken.
Faults captured properlyAny number of faults, each with a severity, a description and its own photos, with a flag when a hazard notice is needed.
A report with no blank pagesThe report is built only from what was captured, with a foldered package of the original photos alongside it.
Checked before it goes outThe office approves the report or returns it with a reason, and keeps its own flags and an activity log for every panel.